Recent time lapse footage of 151 light fixtures beings installed over the course of 2 days, ending with a constellation of energy-efficient LED glowing orbs to balance off the dark ceiling. The space was designed for a a growing technology company headquartered out of NYC. The lights were the final piece installed in the open space work area- they capped an accelerated construction schedule, and complemented the wood accented work surfaces, raw steel framing, and the industrial look of the exposed waffle slab.

 , ,